Power Platform Governance Roadmap
All epics
S10P2DraftPlatform Run the Business
Licensing, Capacity & Cost
Move off deprecated per-app licensing to a per-user and capacity model that funds the chosen governance scenario ahead of the 2028 renewal.
Licence model modernisation, entitlement, capacity thresholds, AI credits and chargeback.
Lead
Vamsi Namuduri
Owner
—
Deliverables
6
Effort
13.5
sprints
Delivered
0/6
Deliverables
| Ref | Title | Phase | Priority | Owner | Sprints | Status | |
|---|---|---|---|---|---|---|---|
| S10.1 | Licence model options analysis Compare per app, per user and capacity based licensing against the governance features each unlocks. Per app is deprecated for the next renewal and 8,000 are currently in use, with only 53 premium per user licences held. | Phase 1 | P1 | Vamsi Namuduri | 3 | Draft | |
| S10.2 | Scenario decision: which future state Take the decision between Fix the basics, Basics plus upscale and Strategic platform. Every downstream item depends on it, and the cost difference between them is smaller than the control difference. | Phase 1 | P1 | Vamsi Namuduri | 2 | Draft | |
| S10.3 | Licence entitlement and assignment process Who is entitled to author, how licences are requested, assigned and reclaimed, and how that is enforced through group based licensing. | Phase 2 | P2 | Vamsi Namuduri | 2 | Draft | |
| S10.4 | Dataverse capacity management and thresholds Thresholds, alerting and an owner for database, log and file capacity. Database capacity currently sits at 77% and is driven by a handful of environments. | Phase 2 | P2 | Dogaru Eduard | 1.5 | Draft | |
| S10.5 | Copilot Studio and AI Builder credit allocation model How Copilot credits and AI Builder capacity are allocated to environments and monitored. Copilot credits are limited at 25,000 and the AI Builder licence type is deprecated for the next renewal. | Phase 2 | P2 | Marius Oprea | 2 | Draft | |
| S10.6 | Chargeback and cross-charging approach How platform cost is attributed back to OpCos and business owners, so cost implications are visible to the people creating them. | Phase 3 | P3 | Vamsi Namuduri | 3 | Draft |
By phase
- Phase 12 · 5 spr
- Phase 23 · 5.5 spr
- Phase 31 · 3 spr
By priority
- P12 items
- P23 items
- P31 items